Change the World 2008

Harnessing BIM Technology and Integrated Project Delivery for Sustainable Design

John Barradas, AIA

Stitching BIM Software into a Business Strategy

A road map of software and level of BIM makes great sense to consider per project. We do not need to provide levels greater than Level 1 model- track Spaces - Automatic, for new Building, Emerging Required Deliverable
-space components, walls, floors and roofs, system, no structure

Level 2: Major Systems Model, Building Operations, spaces detailed, walls, roof, floor details, systems-plumbing fixtures, ducts, lights full framing...

The team may be able to produce only that what is asked by the client as a prelimanary or conceptual design.

Share

Reply to This

About

© 2009   Created by Katherine Gupman on Ning.   Create a Ning Network!

Badges  |  Report an Issue  |  Privacy  |  Terms of Service